SECTION 28: FWD FUSE RIBS, BHDS & BOTTOM SKIN: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

21 January 2024

23 November 2023

25 March 2023

14 February 2023

21 October 2022

20 July 2022

11 July 2022

12 June 2022

24 March 2022

  • curprev 13:2613:26, 24 March 2022Ctennis talk contribs 365 bytes +365 Created page with "Page 28-2 Figure 2: Note that the 7 rivets on each side of the bottom skin must be double flush. This means you have to countersink the shop head side of the main spar so that when they are driven, the shop head sits flush into the spar. The landing gear steel piece sits on top of this area, and the shop head of the rivet will interfere with it if it's not flush."