SECTION 15: REAR SPAR: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
m (→Page 15-5) |
||
Line 10: | Line 10: | ||
== Page 15-5 == | == Page 15-5 == | ||
* Step 1: Match-drilling 4 of the W-1007B holes on the fork's arms create new holes in the flanges of the W-1010-L/R ribs as they don't align with the existing holes in the rib flanges [[File:2022-05-28 15-14-05.jpg|600x600px]] <br> <br>[[File:2022-05-28 15-13-41.jpg|600x600px]] | * Step 1: Match-drilling 4 of the W-1007B holes on the fork's arms create new holes in the flanges of the W-1010-L/R ribs as they don't align with the existing holes in the rib flanges<br>[[File:2022-05-28 15-14-05.jpg|600x600px]]<br> <br>[[File:2022-05-28 15-13-41.jpg|600x600px]] | ||
* Read through the Service Bulletin [https://www.vansaircraft.com/service-information-and-revisions/sb-16-03-28 SB-16-03-28] to better understand the assembly (ignore the drill-out instructions). | * Read through the Service Bulletin [https://www.vansaircraft.com/service-information-and-revisions/sb-16-03-28 SB-16-03-28] to better understand the assembly (ignore the drill-out instructions). | ||
*See also [https://www.facebook.com/groups/vansrv10/posts/5079099468877778/ FB post 6/9/2022] | *See also [https://www.facebook.com/groups/vansrv10/posts/5079099468877778/ FB post 6/9/2022] | ||
[[Category:Hints]] | [[Category:Hints]] |
Revision as of 21:19, 18 January 2024
Build Instruction Updates
- 10/05/21 15_10.pdf
Check for more recent updates here
Page 15-2
(FB 3/20/2022) Aileron bracket errors[Ed: this page isn't very useful, as you have to be a member and logged into Facebook to see it)
YES, all the FB links assume you are a member of the two RV-10 groups: RV-10 (4,700 members) and Van's RV-10 (420 members).
Page 15-3
- Step 3: You are asked to draw a single line along the sloped edge of W-1013D-L/R. You ignore the top horizontal edge of W-1013D-L/R. So W-1013F-L/R will only have a corner trimmed off, you are not shortening the angle in height. See also this FB thread.
Page 15-5
- Step 1: Match-drilling 4 of the W-1007B holes on the fork's arms create new holes in the flanges of the W-1010-L/R ribs as they don't align with the existing holes in the rib flanges
- Read through the Service Bulletin SB-16-03-28 to better understand the assembly (ignore the drill-out instructions).
- See also FB post 6/9/2022