SECTION 15: REAR SPAR: Difference between revisions

From RV10 Community Wiki
Jump to navigation Jump to search
 
(15 intermediate revisions by the same user not shown)
Line 1: Line 1:
=== Build Instruction Updates ===
* 10/05/21 [https://www.vansaircraft.com/wp-content/uploads/2021/10/15_10.pdf 15_10.pdf]
Check for more recent updates [https://www.vansaircraft.com/service-information-and-revisions/?aircraft=rv-10&doctype=revisions-changes&sort=date here]
=== Videos ===
* [https://www.youtube.com/watch?v=fGAk7JUAEgA Plane Lady: Van's Aircraft RV-10 Build: Rear Spar & Service Bulletin 16-03-28]
== Page 15-2 ==
== Page 15-2 ==
[https://www.facebook.com/groups/vansrv10/posts/4860594877394906/ (FB 3/20/2022) Aileron bracket errors[Ed: this page isn't very useful, as you have to be a member and logged into Facebook to see it)]
[https://www.facebook.com/groups/vansrv10/posts/4860594877394906/ (FB 3/20/2022) Aileron bracket errors[Ed: this page isn't very useful, as you have to be a member and logged into Facebook to see it)]<br>YES, all the FB links assume you are a member of the two RV-10 groups: [https://www.facebook.com/groups/vansrv10 RV-10] (4,700 members) and [https://www.facebook.com/groups/249625742733962 Van's RV-10] (420 members).
 
== Page 15-3 ==
* Step 3: You are asked to draw a single line along the sloped edge of W-1013D-L/R. You ignore the top horizontal edge of W-1013D-L/R. So W-1013F-L/R will only have a corner trimmed off, you are not shortening the angle in height. See also this [https://www.facebook.com/groups/vansrv10/posts/6041127229341659/ FB thread].


== Page 15-5 ==
== Page 15-5 ==
* Step 1: 4 of the W-1007B holes on the fork's arms create new holes in the flanges of the W-1010-L/R ribs as they don't align with the existing holes in the rib flanges  
* Step 1: Match-drilling 4 of the W-1007B holes on the fork's arms create new holes in the flanges of the W-1010-L/R ribs as they don't align with the existing holes in the rib flanges<br>[[File:2022-05-28 15-14-05.jpg|600x600px]]<br> <br>[[File:2022-05-28 15-13-41.jpg|600x600px]]
* Read through the Service Bulletin [https://www.vansaircraft.com/service-information-and-revisions/sb-16-03-28 SB-16-03-28] to better understand the assembly (ignore the drill-out instructions).
* Read through the Service Bulletin [https://www.vansaircraft.com/service-information-and-revisions/sb-16-03-28 SB-16-03-28] to better understand the assembly (ignore the drill-out instructions).
*See also [https://www.facebook.com/groups/vansrv10/posts/5079099468877778/ FB post 6/9/2022]
[[Category:Hints]]

Latest revision as of 05:34, 19 January 2024

Build Instruction Updates

Check for more recent updates here

Videos

Page 15-2

(FB 3/20/2022) Aileron bracket errors[Ed: this page isn't very useful, as you have to be a member and logged into Facebook to see it)
YES, all the FB links assume you are a member of the two RV-10 groups: RV-10 (4,700 members) and Van's RV-10 (420 members).

Page 15-3

  • Step 3: You are asked to draw a single line along the sloped edge of W-1013D-L/R. You ignore the top horizontal edge of W-1013D-L/R. So W-1013F-L/R will only have a corner trimmed off, you are not shortening the angle in height. See also this FB thread.

Page 15-5

  • Step 1: Match-drilling 4 of the W-1007B holes on the fork's arms create new holes in the flanges of the W-1010-L/R ribs as they don't align with the existing holes in the rib flanges


  • Read through the Service Bulletin SB-16-03-28 to better understand the assembly (ignore the drill-out instructions).
  • See also FB post 6/9/2022